Weld 1
Joint
Process
2 for fillets on both sides
Section 39.5 mm²Deposit per m 0.310 kg/mEnter a length to get quantities
Efficiency and prices
Deposition efficiency = deposited metal ÷ consumable used, covering stub ends, coating and spatter. Use your own shop figures if you have them. Leave prices blank to skip cost.
GMAW solid wire
Totals
Fill in sizes and lengths to see totals
- Deposit section = groove and gap area + reinforcement; reinforcement = 2/3 × face width × height, face width = groove opening + 4 mm, or 1.414 × K for fillets
- Deposit = section × length × 7.85 g/cm³; consumable = deposit ÷ efficiency
- Not included: back-gouge refill, run-on / run-off tabs, shielding gas