Learn
3D connection library
Prefabricated systems
Steel-tube bundle walls
1.1
Embedded plate detail
预埋件大样轴测图
钢管束柱脚大样
柱脚局部
Drag to orbit · scroll to zoom · right-drag to pan
Erection order (5 steps)
Back
Start
1. 绑扎筏板底筋
2. 安放预埋件并固定
3. 吊装钢管束墙
4. 焊柱脚加强板与马板
5. 柱脚现场角焊缝